Project Overview
The project is GEO 500 Ribeira Grande Geothermal Power Plant Repowering, with products shipped to Italy, and the contract year 2025. The project is a geothermal power plant repowering, where the piping system must accommodate geothermal media and plant operating conditions, creating clear requirements on material matching, size coverage and overall delivery of piping spools.
Supply and Product Details
We supplied PIPING SPOOLS for this project, covering the size range of 0.5″–30″, with a quantity of 6,814 PCS. Material standards cover API SPEC 5L BN/L245N PSL2, ASTM A182/A182M F316L, ASTM A312/A312M TP316L, ASTM A333/A333M GR.6, ASTM A350/A350M LF2 CL1, ASTM A403/A403M WP316L and ASTM A420/A420M WPL6.
Solution
Given the piping characteristics of a geothermal plant repowering, materials were organized by medium and duty: the F316L, TP316L and WP316L stainless steel series for lines with higher corrosion resistance requirements; the A333 GR.6, A350 LF2 CL1 and A420 WPL6 lowtemperature steel series for lowtemperature sections; and API 5L L245N for standard transmission lines. Piping spools were organized by piping system sections, with sizes covering 0.5″–30″, supplying small to large bore spools from one source and reducing onsite procurement by size and secondary fabrication. The 6,814 PCS were delivered according to the project procurement plan, in step with the plant repowering construction schedule.
Project Highlights
Material coverage across stainless steel, lowtemperature steel and line pipe steel, matched by medium and duty.
Size range 0.5″–30″, with small to large bore piping spools supplied from one source.
6,814 PCS supplied in a single project, matching the phased procurement schedule of the plant repowering.
Built for geothermal plant repowering, with spools organized by system section to reduce onsite fabrication.