GEX 2400 Geothermal Power Plant Piping Spools — Dual Requirements of Large Bore and SetBased Delivery
- Turkey

Project Challenges
The project is GEX 2400 24 MW Geothermal Power Plant, with products shipped to Turkey, and the contract year 2024. As a 24 MW geothermal plant construction project, the piping system presented two practical requirements: first, a wide size span from 0.5″ small bore to 52″ large bore, which a singlesize supply could not cover; second, delivery in both set and piece forms, placing higher demands on supply organization and completeness of matching.
Our Approach
For materials, carbon steel and lowalloy steel systems were organized by piping duty: API 5L GR.B and A106 GR.B for standard transmission lines; A105 and A234 WPB for valve and fitting connection sections; A671 CC65 CL12 and A672 C70 CL12 for large bore and more demanding piping sections. For sizes, the range covered 0.5″–52″, with small to large bore piping spools organized from one source. For delivery, set and piece forms were organized separately as required by the project — 888 sets and 1,927 pcs — with sets delivered complete by system and pieces supplied by size and quantity.
A total of 888 sets + 1,927 pcs of piping spools were supplied, covering sizes 0.5″–52″, with materials including API 5L GR.B, A105, A106 GR.B, A234 WPB, A671 CC65 CL12 and A672 C70 CL12, delivered according to the project procurement plan.