Project Overview
The end user of this project is RUMAILA OPERATING ORGANISATION. The project is PWRI1 EXISTING FACILITY TIEINS, located in Iraq, with the contract year 2023. The project involves tieins to existing facilities, where piping must connect to the built system and fittings must match the existing lines in material, size and connection type, creating practical requirements on material matching and size coverage from the supplier.
Supply and Product Details
We supplied ELBOW/REDUCER/TEE fittings for this project, covering the size range of 1″–18″, with a quantity of 446 PCS. Material standards cover ASTM A234/A234M WPB, ASTM A860/A860M WPHY60 and ASTM B366/B366M WPNCMC.
Solution
Given the nature of existing facility tieins, we supported the project in three areas:
First, material selection by piping duty. WPB carbon steel fittings were used for standard duty lines, balancing cost and weldability; WPHY60 lowalloy highstrength steel fittings for sections requiring higher strength and lowtemperature toughness, suited to the site environment and operating pressure in Iraq; WPNCMC nickelbased alloy fittings for corrosive media or special sections, covering the corrosion resistance gap left by carbon and lowalloy steel. The three materials were matched to different piping sections rather than a single material applied throughout.
Second, elbows, reducers and tees supplied as one batch. Tiein work involves diameter changes and branch connections, which a single product type cannot cover. The three fitting types were organized in one batch, with sizes covering 1″–18″, reducing separate procurement by product type.
Third, delivery organized around tiein milestones. Existing facility tieins are subject to construction windows, and the 446 PCS were supplied according to the project procurement plan to match onsite tiein milestones.
Business Cooperation BreakthroughWe have successfully entered the piping supply phase of the Iraq oil field renovation project, established project cooperation with a major domestic pipeline general contractor, and opened channels for future Middle East oil and gas projects.