Super Duplex Steel Fittings for Shallow Water Oil and Gas Pipelines

Project Overview
This project is for the shallow sea oil and gas transportation pipelines. The contract year is 2023. The pipeline components in the shallow sea environment are constantly exposed to seawater immersion and tidal loads, thus requiring continuous requirements for corrosion resistance and material stability. The project is advancing according to the procurement plan, and there are clear demands for the material consistency and delivery schedule of the pipe fittings.
Supply and Product Details
We supplied fittings for this project in size 4″, quantity 129 PCS, material ASTM A815/A815M S32750. S32750 is a super duplex stainless steel with stable resistance to pitting and stress corrosion in seawater, suitable for shallow water pipeline service. Products were manufactured and supplied in accordance with ASTM standards, with material certificates and batch information provided with the goods.
Project Highlights
Material selected for shallow water duty: S32750 super duplex steel to address corrosion risk under seawater immersion and tidal loading, rather than a general carbon steel solution.
Concentrated size and quantity: a single size of 4″ and a single batch of 129 PCS, keeping procurement and acceptance steps concentrated for unified project management.
Material documents supplied with the goods: material certificates and batch information provided together with the products for direct verification at onsite acceptance.
Shallow water experience: this project supports shallow water oil and gas pipelines, with product selection and documentation prepared in line with offshore project practice.
AfterSales Service
After delivery, we provide support for querying and reissuing material certificates, batch information and other documents.
For material and size verification questions raised during onsite acceptance, a dedicated contact is assigned to respond.
For questions related to supply during product use, we provide technical consultation and feedback handling.
For replenishment or additional orders in similar future projects, the material and size records from this project can be reused to shorten the confirmation process.
